Wednesday, July 14, 2010

Solar, Sinks, Newels, and Retaining Wall

The house is a-buzz with work today! There's all kinds of stuff going on.

There's a roof crew prepping the solar panel installation. They've installed several sets of rails to house the 30 panels that will soon be powering the house.

The newel posts (Who wanted to learn a new word today? That means posts at the bottom and tops of staircases.) have gone in.


All sinks and plumbing accessories (towel bars, toilet paper holders, etc.) are being installed.

Kitchen sink

Powder room sink downstairs

Main bath sinks upstairs

Master bath sink (there are 2 of these)

And the retaining wall in the backyard was done on Monday.

Next on the list - landscaping and staircase hand rails!